2.3 Setup
When the VE.Net Battery Controller is connected to a VE.Net panel, the panel is powered through
the UTP (Unshielded Twisted Pair) cable.
Step 1.) Hold “Enter” for 2 seconds to power up the VE.Net Panel. After the panel has started with
only the VE.Net Battery Controller connected the screen will display:
The first line shows the name of the connected device, the second line
shows the quick status.
Step 2.) Pres “Enter” to enter the Battery Controller menu.
Step 3.) Press “▼” to scroll through the menu until you see “Setup Controller”.
Step 4.) Press “Enter” to enter the Setup Controller menu.
• Make sure that you first connect the system
before placing the 1Amp inline fuse!
• You should never connect other devices or
wires to the shunt!
• First read the Safety Precautions in
paragraph 1.4